Category Archives: Case Study

Spider is back at the U.S. Capitol

As our country prepares for the inauguration of our 45th president, Spider once again provided the suspended powered access solution for the installation of the American flags on the U.S. Capitol in Washington D.C. Using cornice hooks, outrigger beams and … Continue reading

Posted in Case Study | Leave a comment

Spider Innovates in Wind Farm Access

Spider is dedicated to creating cutting edge at-height access and safety solutions, and we take pride in our work. We have remained a leader in the suspended access field for nearly 70 years thanks to our consistent dedication to quality, … Continue reading

Posted in Case Study | Tagged | Leave a comment

SpiderLine™ Fall Protection Equipment in Action

Spider’s patented SpiderLine™ Temporary Horizontal Lifeline (THLL) is a safe, reliable, and proven fall protection solution for ironworkers, as well as those working on bridges, building construction, rooftops, and other elevated surfaces. Spider is proud to offer superior features at … Continue reading

Posted in Case Study | Tagged | Leave a comment

Spider Partners with Next Generation Scaffold

Spider has been specializing in top of the line hoists and scaffolding equipment for nearly seven generations, and we are now offering a new and unique vertical and horizontal access solution with significant savings to our customers.  By partnering with … Continue reading

Posted in Case Study | Tagged | Leave a comment

Spider Case Study: Power Plant Maintenance

Spider is an expert in rigging, hoists, and suspended scaffold equipment, and we’ve been supplying at-height contractors for nearly 70 years. One of our services is custom solutions, and we work with our clients to create equipment and platforms designed … Continue reading

Posted in Case Study | Leave a comment

Tesoro Golden Eagle Refinery Soars with Spider Staging

Spider was contacted to provide an access solution to the inside of a 350-foot chimney at Tesoro Golden Eagle Refinery, with goals of performing a safety inspection, demolition of the existing refractory block, surface preparation, and relining and coating the … Continue reading

Posted in Case Study | Tagged | Leave a comment